Menu

Harilalos Trikoupis Bridge (Rion Antirion) 2004

gr
  • Patras, West Greece
  • Across The Gulf of Corinth
  • 3 spans of 560m/1837ft
  • 4 lanes, (2 lanes each way,
  • 2 emergency lanes)
  • Length 2880m/9449ft
  • Designed by Berdj Mikaelian
  • Construction began 1999

 

  • Links Peloponnese peninsula to the Greek mainland.

DECK

  • Composite steel-reinforced concrete

PIERS

  • Reinforced concrete
  • On bed of gravel to counter tectonic movement

CABLES

  • Cable spinning using the controlled tension method