First Bosphorus Bridge 1973

Bridging Two Continents

A very substantial saving in cost was achieved by constructing the cables by aerial spinning. Spinning wheels moved almost continuously from one side of the bridge to the other, laying the individual wires at an average speed of 560m per minute.

The spinning performance was described as ‘exceptional’ and was completed in only 3.5 months.